A pre-handover construction inspection is the final quality check before a new build is handed over to the owner. In Australia, where construction must comply with the National Construction Code (NCC) and various state and territory regulations, this inspection plays a critical role in ensuring that the building meets all contractual and regulatory requirements.
Skipping this step or relying solely on the builder's own checks can leave you with undetected defects that are far more expensive and difficult to address after settlement. An independent pre-handover inspection gives you the information you need to make an informed decision before accepting the property.
Why Pre-Handover Inspections Are Crucial in Australia
Australian construction is governed by the National Construction Code (NCC), which sets minimum standards for structural integrity, fire safety, accessibility, energy efficiency, and waterproofing. Each state and territory also has its own building legislation and consumer protection laws that impose obligations on builders and developers.
Despite these regulations, building defects remain common in new construction. A pre-handover inspection provides an independent assessment of whether the building complies with the NCC, the approved plans, and the terms of the building contract. It is your best opportunity to identify and document defects before you assume responsibility for the property.
What is a Pre-Handover Inspection
A pre-handover inspection, also known as a practical completion inspection or a defect inspection, is a detailed assessment of a newly constructed building conducted before the owner takes possession.
Goals: The primary goal is to identify any defects, incomplete work, or deviations from the approved plans and specifications. The inspection produces a detailed report, often called a snagging list, that documents every issue for the builder to rectify before handover.
Timing: The inspection should be conducted after the builder has declared practical completion but before the final payment is made and the keys are handed over. This timing gives you maximum leverage to require the builder to address any issues.
Difference from stage inspections: Stage inspections are conducted at key points during construction, such as the slab, frame, lock-up, and fixing stages. A pre-handover inspection is the final comprehensive check that covers the entire completed building, including all finishes, fixtures, and external works.
Why a Pre-Handover Inspection is Essential
There are several compelling reasons to invest in an independent pre-handover inspection.
Identifying defects early: Defects found before handover are the builder's responsibility to rectify at no cost to you. These can range from structural issues such as cracking and uneven slabs, to incomplete work such as missing fixtures, to faulty installations such as leaking taps or poorly fitted doors. Catching these issues early avoids the difficulty of pursuing rectification after you have moved in.
Contract compliance: The inspection verifies that the building has been constructed in accordance with the approved plans, specifications, and the terms of your building contract. Any deviations can be documented and raised with the builder before you accept the property.
Avoiding costly repairs: Defects that are not identified before handover can worsen over time and become significantly more expensive to repair. Water ingress from a poorly sealed window, for example, can lead to mould growth and structural damage if left unaddressed.
Strengthening your legal position: A professional inspection report provides documented evidence of defects at the time of handover. This documentation is invaluable if a dispute arises with the builder regarding defect rectification or warranty claims.
What the Inspection Covers
A comprehensive pre-handover inspection assesses every aspect of the completed building.
Structural integrity: The inspector checks the building's structural elements, including the slab, walls, roof structure, and load-bearing components, for signs of cracking, movement, or defective construction.
Interior finishing: All internal finishes are inspected, including paintwork, tiling, cabinetry, benchtops, flooring, doors, and windows. The inspector looks for poor workmanship, damage, and incomplete work.
Electrical and plumbing: Electrical installations, including switches, power points, and light fittings, are checked for proper function and compliance. Plumbing fixtures, taps, toilets, and drainage are also tested.
Building codes compliance: The inspection verifies compliance with the NCC and relevant Australian Standards, including fire safety, waterproofing, energy efficiency, and accessibility requirements.
Defects and snagging list: All defects and issues are documented in a detailed report with photographs. This snagging list is provided to the builder with a request for rectification before the final handover.
Who Should Conduct the Inspection
The inspection should be conducted by an independent, qualified building inspector who is not affiliated with the builder or the developer.
Never rely solely on the builder's own quality checks or a real estate agent's assessment. Builders have a financial interest in achieving practical completion and receiving final payment, and agents have an interest in completing the sale. An independent inspector provides an unbiased assessment that protects your interests.
Look for an inspector who holds a relevant building inspection licence in your state or territory, has experience with new construction inspections, and can provide a detailed written report with photographs.
Step-by-Step Guide
Follow these steps to ensure your pre-handover inspection is thorough and effective.
Engage an independent inspector
Research and hire a qualified, independent building inspector before the builder declares practical completion. Book the inspection in advance to ensure availability.
Review your building contract and plans
Provide the inspector with a copy of your building contract, approved plans, and any variation orders. This allows the inspector to verify that the building matches the agreed specifications.
Attend the inspection
Where possible, attend the inspection in person. This allows you to see any issues firsthand and ask the inspector questions about their findings.
Review the inspection report
Carefully review the detailed inspection report, including the snagging list and photographs. Ensure you understand the severity of each defect and whether it is a major or minor issue.
Present the report to the builder
Provide the inspection report to the builder and request rectification of all identified defects before you make the final payment or accept the keys.
Re-inspect after rectification
Once the builder has addressed the defects, arrange a follow-up inspection to confirm that all items on the snagging list have been satisfactorily resolved.
Common Issues Found
Pre-handover inspections frequently identify a range of defects and incomplete work in new constructions.
Cracking in walls, ceilings, and slabs due to shrinkage or structural movement
Poor paintwork, including uneven coverage, drips, and missed areas
Tiling defects such as uneven surfaces, lippage, cracked tiles, and incomplete grouting
Doors and windows that do not close, lock, or seal properly
Plumbing issues including leaking taps, slow drainage, and incomplete connections
Electrical defects such as non-functioning switches, missing covers, and incorrect wiring
- Waterproofing deficiencies in wet areas
External works including incomplete landscaping, unfinished driveways, and poor drainage
Cabinetry and joinery that is damaged, poorly fitted, or not to specification
Legal Protections for Property Owners
Australian property owners have several legal protections when it comes to building defects in new construction.
Statutory warranty: In most states and territories, builders are required to provide a statutory warranty covering major defects for six years and minor defects for two years from the date of completion. This warranty applies regardless of the terms of the building contract.
Australian Consumer Law: The Australian Consumer Law provides protections against defective goods and services, including building work. If the building does not meet the standard a reasonable consumer would expect, you may have grounds for a claim.
Complaints and dispute resolution: Each state and territory has a building authority or tribunal where you can lodge complaints about defective building work. In NSW, this is NSW Fair Trading and NCAT. In Victoria, it is the Victorian Building Authority and VCAT. These bodies can order rectification or compensation.
Frequently Asked Questions
QWhat happens if the building fails the pre-handover inspection?
If defects are identified, you should provide the inspection report to the builder and request rectification before making the final payment. You are generally not obligated to accept the property or make the final payment until the defects are resolved to a satisfactory standard.
QWho pays for the pre-handover inspection?
The property owner or buyer pays for the independent pre-handover inspection. The cost is typically between $400 and $800 depending on the size and complexity of the property. This is a small investment compared to the potential cost of undetected defects.
QCan I use the inspection report to negotiate with the builder?
Yes. The inspection report provides documented evidence of defects and incomplete work, which gives you a strong basis for negotiating rectification with the builder. In many cases, builders will address the issues promptly when presented with a professional report.
QIs a pre-handover inspection mandatory in Australia?
A pre-handover inspection is not legally mandatory, but it is strongly recommended. Without an independent inspection, you may accept a property with defects that are difficult and costly to rectify after settlement. Many building contracts include a clause allowing for a pre-handover inspection.
QHow long does a pre-handover inspection take?
A typical pre-handover inspection takes between two and four hours, depending on the size and complexity of the property. Larger homes and multi-storey buildings may require additional time to inspect thoroughly.
QShould I attend the pre-handover inspection?
Yes, attending is recommended. It allows you to see defects firsthand, ask the inspector questions, and gain a better understanding of the condition of your new property. However, the inspector will provide a detailed report regardless of whether you attend.
QWhat is the difference between a pre-handover inspection and a
post-settlement inspection?
A pre-handover inspection is conducted before you take possession and make the final payment, giving you maximum leverage to require the builder to rectify defects. A post-settlement inspection is conducted after you have taken possession. While still useful for warranty claims, it does not provide the same negotiating power.
QCan the inspection report be used in legal proceedings?
Yes. A professional inspection report prepared by a qualified building inspector is an admissible document in tribunals and courts. It provides independent, documented evidence of defects at the time of inspection, which can support warranty claims and dispute resolution proceedings.
QShould I also get a pest inspection before handover?
While pest infestations are less common in brand new constructions, a combined building and pest inspection provides comprehensive protection. Termite activity can begin during construction, particularly if timber framing is exposed to soil contact or moisture. It is a worthwhile addition to the pre-handover inspection.
QWhat are the risks of skipping a pre-handover inspection?
Skipping the inspection means you may accept a property with hidden defects that worsen over time and become expensive to repair. Once you have made the final payment and taken possession, your leverage to require the builder to rectify defects is significantly reduced. You may also miss the window for raising defects under the statutory warranty period if issues are not identified promptly.
Key Takeaways
- A pre-handover inspection is the final opportunity to identify defects before accepting a new build
- The inspection should be conducted by an independent, qualified building inspector, not the builder or agent
- It covers structural integrity, interior finishes, electrical, plumbing, building code compliance, and external works
- Common issues include cracking, poor paintwork, tiling defects, plumbing leaks, and incomplete work
- The inspection report provides documented evidence for negotiating rectification with the builder
- Australian property owners are protected by statutory warranties covering major defects for six years and minor defects for two years
- A typical inspection costs $400 to $800 and takes two to four hours
- Always arrange a re-inspection after the builder has addressed the defects identified in the initial report
References and Resources
Related Articles

Understanding Pre-Handover Inspections: A Guide for Homebuyers
Pre-handover inspections are your final opportunity to ensure your new house meets agreed standards and safety requirements before taking possession.

Fixing Inspections Complete Guide
A fixing stage inspection evaluates internal components before they are concealed, including cladding, architraves, doors, and built-in shelves. Learn what to expect.

Construction Defect Inspection
Construction defect inspections systematically assess property structure, materials, and workmanship to identify faults and ensure compliance with Australian Building Codes.